01

Safety group/committee management

Every safety group, one live view.

Every safety group, one live view.

Run every safety group from one live record, from meetings to evidenced closure.

Run every safety group from one live record, from meetings to evidenced closure.

Meetings and minutes. Agendas and minutes drafted, with actions extracted and triangulated against existing action log.

Actions tracked to closure. Every action has an owner, a due date and an escalation route and is closed with evidence.

AE audits and reporting. Statutory documents, audits and inspections, competency requirements, with board-ready reports.

Which NHS estates safety groups can CompliMind support?

How does CompliMind manage safety group meetings and actions?

How can we demonstrate that a safety group action has been closed?

Safety groups

All groups

Name

Next meeting

Actions

Water safety

14 Oct

3 open

Ventilation

21 Oct

All closed

Fire safety

4 Nov

5 open

Electrical

11 Nov

2 open

Medical gases

18 Nov

1 open

Catering

25 Nov

2 open

Cleaning

2 Dec

All closed

Portering

9 Dec

1 open

Reminder drafted for 14 Oct

Water safety group · 3 open actions

Review

Minutes drafted

Ventilation · 4 actions extracted

Review

Non-compliance detected

Fire safety · FRA overdue

Review

Safety groups

All groups

Name

Next meeting

Actions

Water safety

14 Oct

3 open

Ventilation

21 Oct

All closed

Fire safety

4 Nov

5 open

Electrical

11 Nov

2 open

Medical gases

18 Nov

1 open

Catering

25 Nov

2 open

Cleaning

2 Dec

All closed

Portering

9 Dec

1 open

Reminder drafted for 14 Oct

Water safety group · 3 open actions

Review

Minutes drafted

Ventilation · 4 actions extracted

Review

Non-compliance detected

Fire safety · FRA overdue

Review

Action Hub

28 open

Replace failed TMV, Ward 7 sluice

Evidence added

Triggered by

AE(W) audit 2026 · Finding 4

TMV failed 43°C temperature test

NA

Nadia Ahmed

Due 14 Nov

Water Safety Group

Actions from every source

Flush little-used outlets, Block C

Meeting minutes · Water Safety Group, 14 Oct

Assigned

Repair fire door closer, Level 2

Risk assessment · Fire RA Block B, risk R-12

Overdue

Upload MGPS permit-to-work records

PAM · Safety (hard FM), question 3.2

Ready for approval

6 actions extracted

AE(W) audit · ready to assign

Review

Overdue action detected

Fire door closer, Level 2

Review

02

Action tracking

Every action, owned and evidenced.

Every action, owned and evidenced.

Give every action an owner, deadline and clear evidence of closure.

Give every action an owner, deadline and clear evidence of closure.

Every source, one tracker. Audits, minutes, action logs, PAM and risk assessments.

Traced to the trigger. Each action stays linked to the gap or risk that created it.

Closed with evidence. Closure evidence held against the action, ready for audit.

How does CompliMind track compliance actions?

Can actions remain linked to documents and safety groups?

What evidence is retained when an action is closed?

03

Document hub

Every document current and audit-ready.

Every document current and audit-ready.

Keep policies, certificates and compliance documents current and audit-ready.

Keep policies, certificates and compliance documents current and audit-ready.

Version control. Every policy and SOP keeps its full version history.

Linked to guidance. Each document shows the HTMs and regulations it complies with.

Self-triggering reviews. Guidance updates and moved review dates alert owners, actions and groups.

Can CompliMind review policies and SOPs against current guidance?

Which documents can estates teams manage in CompliMind?

How does CompliMind support document control and auditability?

Document hub

142 documents

Waste Management Policy

v4.2

Current

Complies with

HTM 07-01

HTM 00

v4.2 approved 12 Mar 2026 by J. Patel · v4.1 superseded

Medical Gas Policy

v3.0

Review required

Complies with

HTM 02-01 Part A

HTM 02-01 Part B

Water Safety Plan

v2.1

Expired

Complies with

HTM 04-01

ACoP L8

Policy review drafted

HTM 02-01 changed · 3 clauses

Review

Non-compliance detected

Water Safety Plan · overdue

Review

Document hub

142 documents

Waste Management Policy

v4.2

Current

Complies with

HTM 07-01

HTM 00

v4.2 approved 12 Mar 2026 by J. Patel · v4.1 superseded

Medical Gas Policy

v3.0

Review required

Complies with

HTM 02-01 A

HTM 02-01 B

Water Safety Plan

v2.1

Expired

Complies with

HTM 04-01

ACoP L8

Policy review drafted

HTM 02-01 changed · 3 clauses

Review

Non-compliance detected

Water Safety Plan · overdue

Review

Competency matrix

Main Building

Person

Water

Vent

Elec

MGPS

NA

Nadia Ahmed

Estates engineer

AP

AP

MC

Michael Carter

Electrical lead

AP

FC

Fatima Chen

Maintenance tech

CP

CP

CP

HG

Harry Grant

Medical gas engineer

AP

Appointed, in date

Renewal due

Lapsed

Renewal reminder drafted

Michael Carter · AP(Elec) 30 Nov

Review

No in-date AP(MGPS)

Harry Grant · lapsed 2 Oct

Review

04

Training and competency

The right people, qualified for the work.

The right people, qualified for the work.

Track qualifications, appointments and renewals so the right people are in place.

Track qualifications, appointments and renewals so the right people are in place.

Appointments by group. DP, AP, CP, AE and other appointments held against each safety group.

Renewals ahead of time. Expiring training and missing appointment letters flagged before they become gaps.

Accountable sign-off. Competence confirmed by qualified people. CompliMind holds the evidence.

How can NHS estates teams manage training and competency records?

Can CompliMind track AP, CP and other compliance appointments?

Does CompliMind decide whether someone is competent?

05

Audits/inspections

Coming soon

Every audit, from plan to closure.

Every audit, from plan to closure.

Plan, run and record compliance audits, with every finding converted into an owned action and closure evidence.

Plan, run and record compliance audits, with every finding converted into an owned action and closure evidence.

Audit schedule. See which audits and inspections are current, overdue or due next month, by group and discipline.

Built for external auditors. Auditors, such as AEs can complete the pre-audit questionnaires directly in CompliMind.

Run audits, act on findings. Record findings against the relevant question set as you go. Every finding gets an owner, a deadline and closure evidence, linked back to the audit.

Which audits will the module support?

Can Authorising Engineers use it?

Does CompliMind replace the auditor’s judgement?

Ventilation AE audit

Main Theatres

16 of 24 questions answered

Started 9:40

Annual theatre verification complete

Q6 · HTM 03-01 report checked

Pass

Theatre air change rates within limits

Q7 · 2 readings below design

Fail

AHU inspection records up to date

Q8 · 2 of 6 AHUs missing records

Observation

Finding → action

Q7 · Air change rates

Action · NA · 14 Nov

Closure evidence

Non-compliance detected

Air changes · 2 readings low

Review

Records request drafted

AHU records · 4 of 6 missing

Review

Building Assurance Centre

Customise

Water Safety Group

Compliance

Operational

Performance

Water Safety · Overall assurance

Moderate

Improved

vs last month

Feb

Mar

Apr

May

Jun

Jul

Statutory PPM completion

75%

Limited

−16%

vs last month

Statutory roles fully evidenced

90%

Substantial

+15%

vs last month

Remedial actions overdue

5

Moderate

+1

vs last month

Add a metric from any input

CAFM

BMS

Excel

SharePoint

Photos

Manual

Board summary drafted

Water safety · improving

Review

Overdue actions rising

5 remedial actions, up 1

Review

Building Assurance Centre

Customise

Water Safety Group

Compliance

Operational

Performance

Water Safety · Overall assurance

Moderate

Improved

vs last month

Feb

Mar

Apr

May

Jun

Jul

Statutory PPM completion

75%

Limited

−16%

vs last month

Statutory roles fully evidenced

90%

Substantial

+15%

vs last month

Remedial actions overdue

5

Moderate

+1

vs last month

Add a metric from any input

CAFM

BMS

Excel

SharePoint

Photos

Manual

Board summary drafted

Water safety · improving

Review

Overdue actions rising

5 remedial actions, up 1

Review

06

Assurance/operational dashboards

See the whole estate at a glance.

See the whole estate at a glance.

Bring evidence, risks and actions into one live, board-ready assurance view.

Bring evidence, risks and actions into one live, board-ready assurance view.

Built for each safety group. Customise the view and the metrics each group holds.

Any input. Feeds from CAFM, BMS, Excel, SharePoint, photos or manual entry.

Traced to evidence. Every indicator opens the records behind it.

What do CompliMind assurance dashboards show?

How are assurance indicators connected to underlying evidence?

Can CompliMind produce board-ready reports?

Ready to see it on your estate?

Book a demo and we will show you how CompliMind works with your own documents, safety groups and evidence.

Ready to see it on your estate?

Book a demo and we will show you how CompliMind works with your own documents, safety groups and evidence.